Aashka Tiles
Back to Sourcing Guides
June 8, 2026 5 min read tiles

Tiles Quality checking process of Aashka Tiles

We hereby certify that all products supplied by Aashka Tiles undergo a comprehensive 9-stage quality control process, safeguarding compliance with internatio...

We hereby certify that all products supplied by Aashka Tiles undergo a comprehensive 9-stage quality control process, safeguarding compliance with international standards and export requirements.

All materials are inspected, tested, and approved before dispatch.

  • Raw Material Inspection.

Verification of clay, feldspar, and silica composition.

Moisture and impurity testing. Ensures a strong and consistent base material.

  • In-Process Production Control.

Pressing pressure and density monitoring.

Thickness accuracy checks.

Surface and glaze inspection.Maintains uniformity during manufacturing.

  • Kiln Firing Control.

Controlled temperature range (900°C – 1250°C).

Firing cycle monitoring.Ensures proper strength and vitrification.

  • Laboratory Testing

All tiles are tested as per internal and international benchmarks:

Water Absorption Test.

Breaking Strength Test.

Surface Abrasion Resistance (PEI Rating).

Chemical & Stain Resistance.

Slip Resistance (R Rating where applicable).

Guarantees performance and durability

  • Dimensional Accuracy Check.

Length, width, and thickness tolerance verification.

Warpage and flatness inspectionEnsures precise installation.

  • Visual & Surface Inspection.

Shade consistency (batch-wise).

Surface defects (cracks, pinholes, glazing defects)Maintains a premium appearance.

  • Sorting & Grading.

Classification into A Grade / Standard / RejectOnly A Grade material approved for export.

  • Packaging Quality Check.

Export-grade cartons and palletization. (As per your demand, Euro pallet or Normal pallet)

Proper labelling (size, shade, batch, quantity)Prevents transit damage.

  • Pre-Shipment Inspection.

Random sampling from the final lot.

Quantity and packing verificationFinal approval before container loading.

Chat with us